The City of Clearwater implemented a new, easy way of obtaining the bid packages for advertised projects, using this web site. We also provide the information about the Closed Bid Tabulation at the bottom of this page after the bid opening date.
Obtaining Project Plans, Specifications & Bid Packages
Purchasing Division Bid/RFP/RFQ packages
Please read the Doing Business with the City of Clearwater information. The following Bid/RFP/RFQ packages are presented below as Adobe® PDF documents, which you may download, complete, and return to: Purchasing Officer, Purchasing Division of the City of Clearwater, P.O. Box 4748, Clearwater, Florida 33758
| Project Title |
Date Available |
Pre-Bid Conference |
Opening Date/Time |
Date of Award |
Notes |
Plans & Specs |
PIER DEMOLITION (BID 29-12) |
5/9/2012 |
Mandatory: 5/23/2012 10:00 AM Pier Demolition Site
532 Mandalay Ave.
Clearwater, Florida |
6/7/2012 11:00 AM |
|
Project Manager: Leroy Chin 727.562.4856 |
View |
Engineering Projects Ready to Bid
The complete packages for Engineering Projects can be obtained from our Plan Room. Creating a free personal account will be required for first time Visitors.
Prospective bidders on Engineering Projects must be pre-qualified to submit a bid. Engineering Department is responsible for the pre-qualification process. Contractors wanting to pre-qualify to bid projects as a General Contractor must do so two weeks (ten business days) prior to the bid opening date.
Project Title (Number) |
Dates Available |
Pre-Bid Conference |
Opening Date/Time |
Date of Award |
Notes |
Order Plans & Specs |
Reverse Osmosis Plant #1 Concentrate & Backwash Pipelines (09-0018-UT) |
4/27/2012 - 5/21/2012 |
Mandatory: 5/10/2012 9:30 AM 100 S. Myrtle Avenue, Conference Room 130
Clearwater, Florida |
5/24/2012 1:30 PM |
6/20/2012 |
The work for which proposals are invited consists of installation of 8-inch concentrate pipeline, 6-inch backwash pipeline, 3-inch fiber optic conduit and all related appurtenances to begin at the City of Clearwater’s Reverse Osmosis Plant No. 1 to east of the intersection of Drew Street and Old Coachman Road per the project drawings and specifications.
A complete bidders package containing plans, specifications, bond forms, contract form, affidavits and proposal form is available to the general public (Contractors, Sub-contractors, suppliers, vendors, etc.) for review and purchase. However, sealed proposals will only be accepted from those Contractors that are currently City pre-qualified Contractors in the construction category of Water and Force Mains with a minimum pre-qualification amount of $2,000,000. Project Manager: Lan-Anh Nguyen 727-562-4581 Consultant: N/A |
Plan Room |
Marshall Street Salsnes Filter Project (06-0022-UT) |
4/23/2012 - 5/21/2012 |
Mandatory: 5/11/2012 1:00 PM 100 S. Myrtle Avenue, Conference Room 130
Clearwater, Florida 33756 |
5/24/2012 1:30 PM |
6/20/2012 |
The work for which proposals are invited consists of demolition of existing primary clarifiers, equipment, electrical and incidentals. The work includes temporary supports, power, coffer dams and bypass pumping to maintain the facility in complete and full operation. Installation of two (2) Salsnes Filters, filter feed pump, relocated sludge pumps, piping, appurtenance and electrical and instrumentation. The work also includes construction of the concrete pads, concrete structures, sitework, utility relocations associated with the design, and all other work necessary for a complete and operational system. Installation of 24” RAS metering assembly, piping, fittings supports, concrete pads and ancillaries as necessary for a complete and operational system. Integration of new filters into plant PLC/SCADA system; modification and/or expansion of existing PLC/SCADA equipment, equipment interconnections and connection routing; and Record Drawings.
A complete bidders package containing plans, specifications, bond forms, contract form, affidavits and proposal form is available to the general public (Contractors, Sub-contractors, suppliers, vendors, etc.) for review and purchase. However, sealed proposals will only be accepted from those Contractors that are currently City pre-qualified Contractors in the construction category of WASTEWATER/WATER TREATMENT FACILITIES with a minimum pre-qualification amount of $2,000,000. Project Manager: Tom Robertson 727-562-4749 Consultant: N/A N/A |
Plan Room |
Bid Tabulations
Purchasing Division Closed Bid Tabulations
| Project Title |
Date of Opening |
Date of Award |
Bid Tabulation |
ENGINEER OF RECORD (RFQ 16-12) |
4/30/2012 |
|
View |
FIRE STATION 45 (RFQ 11-12) |
2/21/2012 |
|
View |
FIRE STATION 45 (RFQ 11-12) |
2/21/2012 |
|
View |
IRRIGATION SYSTEM (BID 22-12) |
4/5/2012 |
|
View |
SITE GRADING & MISCELLANEOUS DEMOLITION WORKS (BID 20-12) |
4/5/2012 |
|
View |
TOWN POND ALUM FLOC REMOVAL (RFP 17-12) |
3/22/2012 |
|
View |
Engineering Closed Bid Tabulations
None
|