Osceola Avenue Roadway and Infrastructure Improvements

  • Project typeRoadway Improvements
  • Project cost$12.2 million
  • Project scheduleRoad work set to begin Fall 2026, and completed Fall 2027.
Downtown clearwater street scene

Project Background

From Court Street to Drew Street, this project will improve Osceola Avenue with new infrastructure, smoother roads, safer sidewalks, and a more inviting streetscape for residents and visitors.


Project Goal

The project focuses on replacing and repairing aging underground infrastructure while also improving the roadway surface and drainage systems. Sidewalks will be upgraded, and new landscaping features will be added to enhance the streetscape. To improve pedestrian safety, the plan includes the addition of landscaped bulb-outs at crosswalks. The project also supports downtown businesses by incorporating on-street parking and designated loading zones. The streetscape will be inspired by nearby Coachman Park and Cleveland Street. It will tie together lighting, landscaping and public spaces to create a safe, walkable, and attractive downtown. The goal is to make Osceola Avenue a more vibrant, connected place for everyone.

Screenshot 2025-06-24 160112.png

 


Project Timeline

  • Estimated Construction Start: Fall 2026
  • Estimated Construction Completion: Fall 2027 

Project Task Update

Major tasks completed:

  • 100% Plans Submitted 
  • CRA and City Staff met with business owners to talk about the temporary reopening of Cleveland Street and obtain feedback. 
  • Sanitary Sewer inspection at Pierce and Osceola.
  • Sanitary Sewer inspection at Pierce and Osceola:
    • Based on inspection results, pipes cannot be rehabilitated.
    • Engineers designed alternatives to shallow sanitary lines as much as possible.
  • CRA Downtown Construction Meeting: Design team presented to the public on the proposed public realm improvements of the proposed project, see further down on the report for renderings.
  • Close coordination with Harborview and Bluffs developments on utility connections, elevations, Logistics Plans (MOT, construction staging/laydown/site access) and schedules

Strategic Priorities

This project aligns with the following city of Clearwater Strategic Plan Objectives

  • 1.2: Maintain public infrastructure, mobility systems, natural lands, environmental resources, and historic features through systematic management efforts.
  • 1.5: Embrace a culture of innovation that drives continuous improvement and successfully serves all our customers.
  • 3.2 Preserve community livability through responsible development standards, proactive code compliance, and targeted revitalization.
  • Develop accessible and active transportation networks that enhance pedestrian safety and reduce citywide greenhouse gas emissions 

Location

Osceola Ave., Clearwater 33755  View Map

Google Map