A) Permits are required to ensure that projects are safe and held to the latest government and industry codes and standards that protect the safety of the users of the building.
A) In general, a permit is required:
- If you plan to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure
- If you plan to install, alter, repair, remove, convert, or replace any electrical, gas, mechanical, or plumbing system
- For pools and pool cages, fences, tree removal, signs, docks, and sheds (with exceptions for sheds less than 100 square feet)
A) In general, a permit is not required for painting, putting up wallpaper, installing flooring such as tile/carpeting, replacing kitchen/bathroom cabinets or fixtures, or repairing a very small and minor roof leak with a job market value of less than $500. If the work is being done on a property located in a Flood Hazard Area (FHA), complete and submit page one of Application for Non-Substantial Damage / Improvement Review.
A) To obtain a permit, simply complete and submit the appropriate application along with any support materials required. Depending on the type of permit, you will submit your application through the city’s Zoning Portal, ePermit site, or in some cases, in-person or via U.S. Mail. Refer to the specific application or webpage for more information.
A) Depending on the complexity of your project, you may be required to submit documentation, such as plans, diagrams, and/or a materials list, along with your application. Your permit application should be a graphic description of exactly what work you want to do. Refer to the specific application or webpage for more information.
A) The cost is based on the market value of the job and depends on the type of permit. Visit the Fee Estimator page to get an estimated cost for the permit you are applying for. You can also access a printable fee list.
A) The process and timing following the application submission vary depending on the type of permit. All applications will go through a plan review process. Some requests will require inspections and/or a more in-depth review by staff. Applications requesting flexibility from development standards must be scheduled for review and consideration by the city’s Development Review Committee and/or the Community Development Board. While most permits are issued in a matter of days, more complex applications can take several weeks or months. Refer to the specific application or webpage for more information.