Lift Station Electrical Elevation Project
- Project typeInfrastructure Improvements
- Project costUnknown at this time
- Project scheduleTo be determined
- Contractor nameTo be determined
Project Description
The project entails raising the electrical panels above the flood plain and other various improvements needed for the different wastewater lift stations. The full description of the work at each lift station is listed below.
Lift Station 9 (995 Bruce Ave) and Lift Station 10 (50 Verbena St)
-
Furnishing and installing Aluminum Platforms, wet wells, valve vaults and duplex pumping system with the associated electrical work and site work. Improvements include adjacent force mains and gravity sewers.
Lift Stations 11 (500 Mandalay Ave), Lift Station 28 (499 Island Way), Lift Station 39 (715 Island Way) and Lift Station 80 (1608 Sand Key Estates Ct.)
Lift Station 35 (355 Harbor Passage)