Clearwater Beach Marina Replacement Construction Project Construction is underway now and includes two phases of construction. Phase 1 of the construction project has been broken into part A and part B due to damage to the fuel dock that will be undergoing repairs. The first phase includes the complete demolition and rebuild of the west side of the marina.
Edgewater Drive Park Edgewater Drive Park is currently a passive park with limited functionality and use. The park will undergo refurbishment and to include a new pier, expanded parking lot, improved stormwater management, new sidewalks, new bike racks, trash receptacles, benches, environmental educational signage, and an ADA accessible drinking fountain.
Fire Station 47 Construction Project Fire Station 47, located at 1460 Lakeview Rd., was built in the early 70’s. Due to the structure’s age, the station does not meet current best practices and standards and is being replaced.