Beach by Design This special area plan sets forth a series of strategies for the revitalization of Clearwater Beach in six major areas: land use, mobility, off-street parking, catalytic projects, economic feasibility and financing, and design guidelines.
Edgewater Drive Park Edgewater Drive Park is currently a passive park with limited functionality and use. The park will undergo refurbishment and to include a new pier, expanded parking lot, improved stormwater management, new sidewalks, new bike racks, trash receptacles, benches, environmental educational signage, and an ADA accessible drinking fountain.
The Ballad Hotel A new 158-key hotel is being built on the eastern edge of Coachman Park and it will have a parking garage, rooftop bar, retail and meeting space.