NE WRF Distribution Centers 1 & 2 and MCC-1 Replacement

Closed March 27, 2024, 02:00 PM

  • Reference number17-0028-UT
  • StatusClosed
  • SummaryCreating new electrical room, installing new access door, and addressing concrete floor subsidence. Replacing and relocating the mixer motor control center (MCC) and switchgear distribution centers. Removing existing FRP structure. Installing a New 1200A Nema 4X Service Entrance Breaker. Incorporating smart MCC into SCADA. Replacing concrete block wall and footer – Refer to Specs Section 01 11 13.

Pre-Bid Conference Virtual Zoom Meeting: February 22, 2024 at 10:00 am 

Zoom Meeting: https://us02web.zoom.us/j/86031905966?pwd=V2ZSRGYyM3lienBsMVdMQitndHZjZz09

Meeting ID: 860 3190 5966

Passcode: 631912

Bid Opening Conference Virtual Zoom Meeting: March 27, 2024 at 2:00pm 

Zoom Meeting: https://us02web.zoom.us/j/87332270097?pwd=MjZkL05MUGpjWWlvVjVQZ1dOUlhLUT09

Meeting ID: 873 3227 0097

Passcode: 942653

Contract Documents:17-0028-UT-NE-WRF-DC1-2-MCC-1-Contract-Documents.pdf(PDF, 85MB)

Drawings: 17-0028-UT-NEWRF-MCC-drawing-set.pdf(PDF, 10MB)

Bid Tab: 17-0028-UT-Bid-Tab.xlsx(XLSX, 30KB)

Pre-Bid Meeting Agenda:17-0028-UT-PreBid-Agenda.pdf(PDF, 302KB)

Pre-Bid Meeting Sign-in: 17-0028-UT-PreBid-Sign-In.pdf(PDF, 154KB)

Addendum #1: 17-0028-UT-Addendum-1.pdf(PDF, 147KB)

Addendum #2: 17_0028_UT-Addendum-2.pdf(PDF, 170KB)

Section 5:17-0028-UT-Section-5.pdf(PDF, 367KB)

Full size drawings: 17-0028-UT-IFB-NE-MCC-AND-DC1-DC2-REPLACEMENT-full-size-drawings.pdf(PDF, 19MB)

Notice of Intent:17-0028-UT-NOIT.pdf(PDF, 93KB) (PDF, 93KB)

Bid Tab:17-0028-UT-Bid-Tab-Recording-Sheet.pdf(PDF, 119KB)